top of page

All Posts


Addressing Platinum Processing Bottlenecks with geotextile tube dewatering in mining
A platinum processing plant faced ongoing filter press bottlenecks as concentrator throughput exceeded capacity, resulting in breakdowns and rising maintenance costs. Geotextile tube dewatering was introduced as a secondary solution. Pilot testing on 50–55% solids slurry achieved ~40% volume reduction within 13 hours, with further consolidation to 15–20% moisture. The system now provides scalable, low-maintenance capacity, improving operational resilience.

Terravua
Mar 303 min read


Sludge dewatering with Titan Tubes, Dewatering on a Drying Bed: Clear Filtrate, Fast Drain-Down, and Repeatable Cycles
Effective sludge dewatering remains a major bottleneck for many wastewater treatment facilities — especially where drying beds can’t keep up with throughput or changing sludge characteristics. Terravua recently completed a Titan geotextile dewatering tube pilot demonstration

Terravua
Feb 173 min read


Bench-Scale Compatibility Testing for Geotextile Tube Dewatering at Municipal Wastewater Facilities, municipal sludge dewatering
Bench-scale testing confirmed municipal pond sludge can be effectively dewatered using geotextile tubes when polymer conditioning and managed fill/drain cycles are applied. This case study summarises outcomes and planning allowances for pilot-to-full-scale implementation.

Terravua
Jan 144 min read


Enhancing Sludge Management with geotextile tube dewatering
Sludge dewatering project where Titan Tubes and controlled polymer conditioning delivered consistent solids capture and clarified filtrate recovery—reducing disposal volumes and supporting process-water re-use in an operating plant

Terravua
Dec 29, 20253 min read
bottom of page
